patterns > strikkekaffe
> Korshavn Sweater Junior
Korshavn Sweater Junior
Korshavn Sweater Junior is worked bottom up in basket pattern according the chart. First the ribbing and body are worked in the round. The ribbing is worked with twisted knit stitches. The body is then divided into yoke and sleeves and both front and back are finished separately. You cast off stitches for the neckline both at front and back and knit the shoulders together. You then pick up stitches around the armhole openings for the sleeves, which are worked in the round with decreases following the chart. Finally, you pick up stitches around the neckline and the ribbing is folded to the sweater’s wrong side.
Please check the stated measurements and size guide for your correct size. Get familiar with the chart before you start knitting. Remember to knit a gauge swatch first. Take measurements of your gauge swatch after washing and blocking. Adjust the needle size, if necessary.
Sizes
3-6 months (6-12 months) 1-3 years (3-5 years) 5-7 years (7-9 years) 9-10 years (10-12 years) 12-14 years
Size guide
The sweater has a positive ease of approx. 5-10 cm (larger than the child’s bust measurement)
Measurements (sweater)
Circumference: 53(58) 62 (67) 71 (76) 80 (84) 88 cm
Length: 27 (30) 36 (40) 43 (45) 48 (51) 53 cm (measured centre back below the neckline)
Gauge
18/10 in basketweave according chart on needle 5 mm
(18 stitches x 27 rounds = 10 x 10 cm)
Needles
Circular needle 4,5 mm (40, 60 and/or 80 cm)
Circular needle 5 mm (40, 60 and/or 80 cm)
Double pointed needles 4,5 og 5 mm
Materials
150 (200) 250 (300) 350 (350) 400 (450) 500 g Peer Gynt by Sandnes Garn (91 m / 50 g) knit together with 50 (50) 50 (75) 75 (75) 75 (100) 100 g Tynn Silk Mohair by Sandnes Garn (212 m / 25 g)
The grey sweater is knit with Peer Gynt 1032 together with Tynn Silk Mohair 1022.
The green sweater is knit with Peer Gynt 9572 together with Silk Mohair colour 68 by Isager.
Special techniques
- Basket weave pattern according chart
- Knit tbl
- Cast off with 3rd needle
- Italian tubular cast on
- Italian tubular bind off
14046 projects
stashed 8742 times
17414 projects
stashed 7759 times
- First published: April 2021
- Page created: April 22, 2021
- Last updated: September 13, 2023 …
- visits in the last 24 hours
- visitors right now