patterns > Outi Kater's Ravelry Downloads and 1 more...
> Dalriada Sweater
Dalriada Sweater
DALRIADA yoked sweater is knitted from the top down using Jamieson & Smith’s 2 Ply Jumper Weight yarn. After the rib neckband, German short rows are used at the back neck before working the colourwork yoke. Top-down construction allows the knitter to try the jumper on at an early stage, and there is no need for grafting as the sleeve underarm stitches are picked up and knitted from the body’s underarm stitches.
Sizes**
8 sizes to fit bust 81-157cm (32-62in)
Yarn
Jamieson & Smith 2 Ply Jumper Weight (4 ply weight; 100% Shetland wool; 115m/ 125yds per 25g ball)
A 2 (Grey Fawn) 2 (2:2:2:2:2:3:3) x 25g balls
B 122 (Dark Mixed Orange) 1 (1:1:1:1:1:1:1:) x 25g balls
C 203 (Light Grey) 1 (1:1:1:1:1:1:1) x 25g balls
D FC12 (Grass Green) 11 (12:13:14:15:16:17:18) x 25g balls
E FC44 (Brown Mix) 1 (1:1:1:1:1:1:1) x 25g balls
F 121 (Marled Yellow) 1 (1:1:1:1:1:1:1) x 25g balls
Needles and accessories
2.75mm (UK 12/US 2) circular needles,
80-120cm long
3.25mm (UK 10/US 3) circular needles,
80-120cm long
Set of 2.75mm (UK 12/US 2) double-pointed
needles (DPNs)
Set of 3.25mm (UK 10/US 3) DPNs
Stitch markers
Stitch holders
Tension
27 sts and 43 rounds to 10cm using 2.75mm
needles over st st.
27 sts and 35 rounds to 10cm using 3.25mm
needles over Chart patt.
On Ravelry the pattern is correct.
Errata for Dalriada sweater (The Knitter issue 195 1.11.2023)
Under WORK SHORT ROWS, the Short row 2 should read:
Short row 2 (WS): Purl to centre back mrk, slm, P29 (33:35:36:39:41:42:43), turn work…
After Short rows, before YOKE, detailed instructions for the increase round should read:
Sizes 3, 4, 5, 6, 7, and 8 only
You will now increase - (-:4:20:28:32:48:58) sts across the next rnd. Follow the increase instructions below for your size.
Size 3 only
Next rnd (inc): K25, (M1, K50) 3 times, M1, K25.
Size 4 only
Next rnd (inc): K5, (M1, K11) 4 times, (M1, K10) 11 times, (M1, K11) 4 times, M1, K5.
Size 5 only
Next rnd (inc): K4, (M1, K8) 27 times, M1, K4.
Size 6 only
Next rnd (inc): K4, (M1, K7) 12 times, (M1, K8) 7 times, (M1, K7) 12 times, M1, K4.
Size 7 only
Next rnd (inc): K2, (M1, K5) 47 times, M1, K3.
Size 8 only
Next rnd (inc): K2, (M1, K5) 8 times, (M1, K4) 41 times, (M1, K5) 8 times, M1, K2.
All sizes
168 (192:204:228:252:264:288:306) sts.
Under YOKE, all sizes should start with stitch 1 of the chart. It should read:
Work rnds 1-6 of Chart, working the patt rep 28 (32:34:38:42:44:48:51) times…
28028 projects
stashed 42324 times
- First published: November 2023
- Page created: November 11, 2023
- Last updated: November 11, 2024 …
- visits in the last 24 hours
- visitors right now